Infrastructure
| Phase I | Phase II |
|---|
| Quay Length (metre) | 340 | 680 |
|---|
| Quay Cranes | 5 | 9 |
|---|
| RTGC | 17 | 28 |
|---|
| RMGC | 3 | 3 |
|---|
| Rail Siding | 2 | 2 |
|---|
| Reach Stackers | 2 | 2 |
|---|
| Gate Lanes | 7 | 10 |
|---|
PHASE I - 2023/24
- Widening & Strengthening of existing berth length of 680 Mtrs.
- Fully Operational Berth of 340 Mtrs.
- Terminal Capacity: 0.6 million TEUs
PHASE II - 2025
- Fully Developed & Operational Quay of 680 Mtrs.
- Berth side - Rail span increased to 30.5 m
- Induction of 5 new Super Post Panamax Cranes
- Ability to Handle 18000 TEU / 22 Rows Across vessels with 15m Plus draft
- Terminal Capacity: 1.8 million TEUS